Repository logo
 

Recommandation d'application du tir par paires de charges rapprochées dans les conditions de la carrière de minerai de fer de Boukhadra.

dc.contributor.authorBARIKA, Doha
dc.contributor.authorBOULOUBER, Amina
dc.date.accessioned2023-11-15T12:02:01Z
dc.date.available2023-11-15T12:02:01Z
dc.date.issued2023
dc.description.abstractABSTRACT Breaking rocks represents the first phase of the technological processes for the exploitation of open pit deposits. It consists in modifying the natural state of the rocks in order to minimize the blocometry and consequently an ease in the level of the extraction work. The quality of blasting rock fragmentation now remains a serious concern for mining companies, as well as the problem of outrigger exit and poor blast energy management at the toe of the bleacher. This work will be the subject of an analytical, empirical study and suggestion of a method of felling that is suitable for the best management of the energy of the shot at the level of the foot of the step of the open pit mine of Boukhadra. The purpose of this end-of-study project is to solve the problem of oversize exit at the foot, which will allow us to increase the performance of loading, transport and crushing equipment, which will reduce the cost price. of a ton of ore and developing a flat wave from it reduces the unsettled fragmentation zone.en_US
dc.description.provenanceSubmitted by mine mine (dspace-mine@univ-tebessa.dz) on 2023-11-15T12:02:01Z No. of bitstreams: 1 Mémoire Final Barika et Boulouber.pdf: 6911757 bytes, checksum: ac2c9f762b311005f2739f2a177f95ba (MD5)en
dc.description.provenanceMade available in DSpace on 2023-11-15T12:02:01Z (GMT). No. of bitstreams: 1 Mémoire Final Barika et Boulouber.pdf: 6911757 bytes, checksum: ac2c9f762b311005f2739f2a177f95ba (MD5) Previous issue date: 2023en
dc.identifier.urihttp//localhost:8080/jspui/handle/123456789/10806
dc.language.isofren_US
dc.subjectKey words: slaughter; rock fragmentation; off-gabaries; shot energy; foot of the bleacher; equipment performance; the unsettled fragmentation zone.en_US
dc.titleRecommandation d'application du tir par paires de charges rapprochées dans les conditions de la carrière de minerai de fer de Boukhadra.en_US
dc.typeThesisen_US

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Mémoire Final Barika et Boulouber.pdf
Size:
6.59 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: